During the last week Chandra completed the observing schedule as planned. A real-time procedure was executed on Nov 2 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. Of note this week was the Chandra Quarterly Review conducted on Nov 2 in Cambridge. The schedule of targets for the next week is shown below and includes an observation of NGC 3227 coordinated with XMM and NuSTAR. |
------------------------------------------
Radiation Belts Nov 8
Abell1795outskirts ACIS-I
Perseuscoldfront2 ACIS-I Nov 9
NGC3227 ACIS-S/HETG
Abell1795outskirts ACIS-I Nov 10
Radiation Belts Nov 11
Perseuscoldfront2 ACIS-I
Abell1795outskirts ACIS-I
BootesCy17-1 ACIS-I Nov 12
CygnusA-Nucleus ACIS-I
BootesCy17-1 ACIS-I
Radiation Belts Nov 13
G292.0+1.8 ACIS-I
PSZ1G254.58-32.16 ACIS-S Nov 14
GALEXJ010724.7+1332 ACIS-S------------------------------------------
All spacecraft subsystems continued to support nominal operations.