News by Date
Open and close menu tab
News by Category
Open and close menu tab
Press Resources
Open and close menu tab
Web Shortcuts
Open and close menu tab
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 24 June 2016 9.00am EDT

During the last week the observing schedule was replanned to incorporate an observation of 1E161348-5055, which was accepted as a Director's Discretionary Time Target of Opportunity on Jun 23. A scheduled observation of Sz 102 was impacted by the replan and will be rescheduled in a future week.

The schedule of targets for the next week is shown below and includes an observation of M82 offset 2 coordinated with NuSTAR and an observation of 3C273 coordinated with XMM-Newton and NuStar.



------------------------------------------
        3C273                  ACIS-S/HETG  Jun 27
        GM24                   ACIS-I
        GX340+0                ACIS-S/HETG
        M107                   ACIS-S       Jun 28
        Abell1795outskirts     ACIS-I
        Radiation Belts                     Jun 29
        NGC6744                ACIS-I
        Vega                   HRC-I
        Mkn421                 ACIS-S/LETG
        GM24                   ACIS-I       Jun 30
        Abell1795outskirts     ACIS-I
        fcc177                 ACIS-S       Jul  1
        Radiation Belts
        M82offset2             ACIS-I
        M19                    ACIS-S       Jul  2
        4U1705-44              ACIS-S/HETG
        CygnusA-WHotspot       ACIS-I
        SDSSJ210308.8-00274    ACIS-S       Jul  3
        PSZ2G048.24-51.59      ACIS-I
        PSZ2G140.90-52.52      ACIS-I
        Radiation Belts

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports