Friday 6 May 2016 9.00am EDT
During the last week Chandra completed the observing schedule as planned. An aspect camera dark (ACA) current calibration was performed from the on-board loads on May 4. An assessment of the data is underway. A real-time procedure was executed on May 5 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. A second real-time procedure was executed on May 5 to disable the multiple stars suspected filter in the ACA Data Processing subfunction running in the on-board computer. A recent change has mission operations conducted with the filter disabled at all times but commanding associated with the ACA dark current measurement re-enabled the filter. The schedule of targets for the next week is shown below and includes observations of 2MASS J13413291+0805048 and SDSS J1556+1124 coordinated with ground-based observatories and an observation of ESO 509-G038 coordinated with NuSTAR |
------------------------------------------
Radiation Belts May 10
Abell2028 ACIS-S
CygnusA-NWSubclu ACIS-I
GC-GBinterfac (11 obs) ACIS-I May 11
SDSSJ1556+1124 ACIS-S
CygnusA-NWSubclu ACIS-I
Abell2028 ACIS-S
Radiation Belts May 12
LBQS1443+0141 ACIS-S
PMNJ1603-4904 ACIS-I
2MASSJ13413291+0805 ACIS-S May 13
BootesCy17-1 ACIS-I
Tol1247-232 ACIS-S
SPT-CLJ0313-5334 ACIS-I
ESO509-G038 ACIS-S
BootesCy17-1 ACIS-I May 14
Tol1247-232 ACIS-S
SPT-CLJ0313-5334 ACIS-I
Radiation Belts May 15
Mkn1498 ACIS-S------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports

