CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 4 December 2015 9.00am EST
During the last week Chandra completed the observing schedule as planned. A real-time procedure was executed on Dec 2 perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. The schedule of targets for the next week is shown below |
------------------------------------------
Radiation Belts Dec 4 NGC741 ACIS-S Radiation Belts Dec 5 NGC741 ACIS-S Mrk104 ACIS-S A1795 ACIS-S 202059222 ACIS-S Dec 7 PSZ2G209.79+10.23 ACIS-I Perseuscluster (3 obs) ACIS-I J085125.81+393541.7 ACIS-S NGC2208 ACIS-S Mrk1230 ACIS-S Radiation Belts Dec 8 30Doradus ACIS-I ProximaCen HRC-I Dec 9 30Doradus ACIS-I Perseuscluster (6 obs) ACIS-I ChandraDeepField-S ACIS-I Radiation Belts Dec 11 30Doradus ACIS-I Perseuscluster ACIS-I
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports