Friday 4 December 2015 9.00am EST
During the last week Chandra completed the observing schedule as planned. A real-time procedure was executed on Dec 2 perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. The schedule of targets for the next week is shown below |
------------------------------------------
Radiation Belts Dec 4
NGC741 ACIS-S
Radiation Belts Dec 5
NGC741 ACIS-S
Mrk104 ACIS-S
A1795 ACIS-S
202059222 ACIS-S Dec 7
PSZ2G209.79+10.23 ACIS-I
Perseuscluster (3 obs) ACIS-I
J085125.81+393541.7 ACIS-S
NGC2208 ACIS-S
Mrk1230 ACIS-S
Radiation Belts Dec 8
30Doradus ACIS-I
ProximaCen HRC-I Dec 9
30Doradus ACIS-I
Perseuscluster (6 obs) ACIS-I
ChandraDeepField-S ACIS-I
Radiation Belts Dec 11
30Doradus ACIS-I
Perseuscluster ACIS-I------------------------------------------
All spacecraft subsystems continued to support nominal operations.