Friday 3 April 2015 9.00am EDT
During the last week the observing schedule was replanned to incorporate an observation of GK Persei, which was accepted as a Director's Discretionary Time Target of Opportunity on Mar 29. Loads for the replanned schedule will be uplinked later today. Scheduled observations of 2MASX J03534246+3714 and IRAS04124-0803 were impacted by the replan and will be rescheduled in future weeks. An aspect camera dark current calibration was performed from the on-board loads on Mar 31 - Apr 1. An assessment of the data indicates nominal aspect camera performance and that the number of CCD warm pixels is increasing at the expected rate. A real-time procedure was executed on Apr 1 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. The schedule of targets for the next two weeks is shown below and includes an observation of GRB 150314A, which is a Target of Opportunity follow-up accepted on Mar 19, an observation of RW Aur, which was accepted as a Director's Discretionary Time TOO on Mar 20, observations of the Crab and PG 1211+143 coordinated with HST and an observation of SDSS J1522+0327 coordinated with ground-based observatories. |
------------------------------------------
Radiation Belts Apr 6
A1795 ACIS-S
SwiftJ1644+57 ACIS-S
A1795 ACIS-I Apr 7
BRC2 ACIS-I
A1795 (7 obs) ACIS-I
Radiation Belts Apr 8
PG1211+143 ACIS-S/HETG Apr 9
Crab ACIS-S Apr 10
PG1211+143 ACIS-S/HETG
A1795 ACIS-S Apr 11
Radiation Belts
SDSSJ1522+0327 ACIS-S Apr 12
PG1211+143 ACIS-S/HETG
GRB150314A ACIS-S Apr 13
PG1211+143 ACIS-S/HETG
Radiation Belts Apr 14
SgrA* ACIS-S
SDSSJ080934.64+2548 ACIS-S
A1795 ACIS-I Apr 15
PG1211+143 ACIS-S/HETG
A1795 ACIS-S Apr 16
RWAur ACIS-S
Radiation Belts
PG1211+143 ACIS-S/HETG Apr 17
A1795 (3 obs) ACIS-I Apr 18
1928+738 ACIS-S
Radiation Belts Apr 19------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports