Friday 6 February 2015 9.00am EDT
During the last week Chandra completed the observing schedule as planned. Chandra passed through the seventh (and final) eclipse of the season on Feb 1, with nominal power and thermal performance. Real-time procedures were executed on Feb 1 to disable SCS-29 and to dump and clear the EPS glitch counters as post-eclipse season actions. A real-time procedure was executed on Jan 31 to swap the prime solid-state recorder (SSR) from the B-side to the A-side. This swap concludes a six-month interval of health and trending data collection on SSR-B. A second real-time procedure was executed on Feb 4 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. The schedule of targets for the next two weeks is shown below and includes an observation of Swift J123205.1-1056, which was accepted as a Director's Discretionary Time TOO on Jan 14, and an observation of GRB150202A, which was accepted as a Target of Opportunity on Feb 4. |
------------------------------------------
Abell1795outskirts ACIS-I Feb 8
MACSJ1149.5+2223 ACIS-I Feb 9
Radiation Belts
SwiftJ123205.1-1056 ACIS-S Feb 10
GRB150202A ACIS-S
J152637.36+065941.6 ACIS-S
MACSJ1149.5+2223 ACIS-I
Abell1795outskirts ACIS-I Feb 11
Radiation Belts Feb 12
GJ1142A ACIS-S
SgrA* ACIS-S Feb 13
SerX-1 ACIS-S/HETG
3XMMJ172751.4-14143 ACIS-S Feb 14
30Doradus ACIS-I
Radiation Belts
Abell1795outskirts ACIS-I Feb 15
He2-10 ACIS-S Feb 16
NGC4254 ACIS-I
SwiftJ1644+57 ACIS-S Feb 17
Radiation Belts
MACSJ1149.5+2223 ACIS-I Feb 18
LBQS1203+1530 ACIS-S
NGC5023 ACIS-S Feb 19
G55.6+2.0 ACIS-I
RXJ0132.6-0804 ACIS-I
30Doradus ACIS-I
Radiation Belts Feb 20
RXJ0806 ACIS-I
NGC406 ACIS-S Feb 21
SerX-1 ACIS-S/HETG
NGC4387 ACIS-S
Xclass2305 ACIS-S Feb 22
2FGLJ1839.0-0102 ACIS-I
SwiftJ1644+57 ACIS-S
Radiation Belts------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports