News by Date
Open and close menu tab
News by Category
Open and close menu tab
Press Resources
Open and close menu tab
Web Shortcuts
Open and close menu tab
Operations CXO Status Report

Friday 8 February 2013 9.00am EST

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Feb 6 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

The schedule of targets for the next week is shown below and includes an observation of GJ 436 coordinated with HST.



------------------------------------------
         RCW120                 ACIS-I       Feb 11
         SDSS1138+0314          ACIS-S
         RCW86                  ACIS-S       Feb 12
         Radiation Belts
         1RXSJ141256.0+79220    ACIS-S
         SDSSJ1332+0347         ACIS-S       Feb 13
         IRASF00183-7111        ACIS-S
         HD79826                ACIS-S/HETG
         N113                   ACIS-I
         HD79826                ACIS-S/HETG  Feb 14
         CODEX57507             ACIS-I
         RCW86                  ACIS-S
         Radiation Belts                     Feb 15
         SDSSJ082657.15+3606    ACIS-I
         SDSSJ115714.98+0816    ACIS-S
         G241.97+14.85          ACIS-I       Feb 16
         GJ436                  ACIS-S
         HESSJ1843-033B         ACIS-I
         PSRJ0101-6422          ACIS-I       Feb 17
         XTEJ1858+034           ACIS-S
         G359.1+0.9             ACIS-I
         RCW86                  ACIS-S
         Radiation Belts
         1RXSJ141256.0+79220    ACIS-S       Feb 18
         M31BHXN                ACIS-I
         NGC6369                ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports