News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
Web Shortcuts
Chandra Blog
RSS Feed
Image Use Policy
Questions & Answers
Glossary of Terms
Operations CXO Status Report

Friday 11 February 2005 11.00am EST

During the last week loads were replaned to ensure proper thermal constraints for a propulsion line following a yellow limit violation on 6 Feb. As a result of the replan, the order of targets DLS J0514-4904 and 1249+3038 was changed to ensure a favorable temperature profile.

The schedule of targets for the next week is shown below and includes a DDT observation of PSR J0437-4715.

------------------------------------------
NGC 3690               ACIS-S       Feb 13
1ES 1239+069           HRC-I        Feb 14
RX J1308.8+2127        ACIS-S
M87                    ACIS-S
Radiation Belts
RX J1308.8+2127        ACIS-S       Feb 15
Cygnus A               ACIS-I
cl1003+3253            ACIS-I
cl1117+1744            ACIS-I       Feb 16
Cygnus A               ACIS-I
Radiation Belts                     Feb 17
RX J0806.4-4123        ACIS-I       Feb 18
PSR J0437-4715         ACIS-S
2MASS 194915-55101     ACIS-S
SDSS J101627.32-00     ACIS-S
RXCJ1213.3-2617        ACIS-S
RX J1308.8+2127        ACIS-S
Cygnus A               ACIS-I       Feb 19
cl0958+4702            ACIS-I
cl0853+5759            ACIS-I
Radiation Belts
HZ43                   HRC-I/LETG   Feb 20
Vega                   ACIS-I
Vega                   ACIS-S
Vega                   HRC-I
Vega (4 obs)           HRC-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports