Operations CXO Status Report

Friday 7 January 2011 9.00am EST

During the last two weeks Chandra completed the observing schedule as planned.

A real-time procedure was executed on Jan 5 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. A second real-time procedure was completed on Jan 6 to update the on-board ephemeris.

The schedule of targets for the next week is shown below

------------------------------------------
         Radiation Belts                     Jan 10
         SPT-CL0324-6236        ACIS-I
         ESO137-002             ACIS-S
         SDSSJ145828.64+01323   ACIS-S       Jan 11
         PGC1223766             ACIS-S       Jan 12
         SDSSJ0945+1009         ACIS-S
         GZ_merger_AGN_4        ACIS-I
         1624+049               ACIS-S
         A2457                  ACIS-I
         SPT-CL0324-6236        ACIS-I
         Radiation Belts
         M31                    ACIS-I       Jan 13
         BlancoCosmological     ACIS-S
         A2204_Field4           ACIS-I
         LeoT                   ACIS-S
         0907+049               ACIS-S       Jan 14
         RMCPL1                 ACIS-I
         BlancoCosmological     ACIS-S
         Crab                   ACIS-S
         XMMUJ0954+1738         ACIS-S       Jan 15
         Radiation Belts
         BlancoCosmological     ACIS-S
         NGC1589-OT             ACIS-S       Jan 16
         IRAS05589+2828         ACIS-S
         XMMUJ0954+1738         ACIS-S
         1FGLJ1511.9-2253       ACIS-I       Jan 17
         BlancoCosmological     ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports