News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
Web Shortcuts
Chandra Blog
RSS Feed
Image Use Policy
Questions & Answers
Glossary of Terms
Operations CXO Status Report

Friday 19 September 2003 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

Real-time procedures were completed on 12 Sept to swap back from SSR-B to SSR-A after a DSN outage led to two missed passes and an autonomous switch to SSR-B. JPL resolved the problem and all data were recovered during the following pass. A real-time procedure was completed on Feb17 to update the on-board ephemeris.

The 4 Years of Chandra Observations, A Tribute to Riccardo Giacconi Symposium was held in Huntsville Sept 16-18. In addition to the excellent science program, highlights included Dr. Giacconi's address and a visit by STS-93 crew Cady Coleman and Jeff Ashby.

Two press releases were issued in conjunction with the Symposium. The releases titled 'Luna Prospecting with Chandra' and '"Iron-Clad" evidence For Spinning Black Hole' can be found at: http://chandra.harvard.edu/press/03_releases/press_091603.html. http://chandra.harvard.edu/press/03_releases/press_091703.html.

The observing schedule for next week is shown below and includes a calibration observation of Capella coordinated with XMM-Newton.

------------------------------------------
44I BOO                HRC-S/LETG   Sep 21
NGC 5204 X-1           ACIS-S       Sep 23
HR 6200                HRC-I
Radiation Belts
NGC 7619               ACIS-S       Sep 24
CL1641+4001            ACIS-I
4U 1323-619            ACIS-S/HETG  Sep 25
4U1755-33              ACIS-S
V4743 Sgr              HRC-S/LETG
Radiation Belts
Crab Pulsar            HRC-S/LETG   Sep 26
Eta Carinae            ACIS-S/HETG
Capella                ACIS-S/HETG  Sep 27
Capella                HRC-S/LETG   Sep 28
B2 1615+35             ACIS-S

------------------------------------------

All spacecraft subsystems continued to operate nominally.

Return to Status Reports