News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
Web Shortcuts
Chandra Blog
RSS Feed
Image Use Policy
Questions & Answers
Glossary of Terms
Operations CXO Status Report

Friday 4 September 2026 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

Real-time procedures were executed on Sep 2 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE).

Of note this week, a call for white papers for a new set of Chandra Cool Target (CCTs) was released. These are targets useful to assist in thermal control of Chandra susbsystems when suitable non-CCT targets are not available. The current call will supplement the targets selected from the first call in 2018. White papers are due Oct 23. For details, see https://cxc.cfa.harvard.edu/proposer/CCTs.html

The schedule of targets for the next week is shown below.



------------------------------------------
        Radiation Belts                     Sep  7
        SDSSJ162501.98+4309    ACIS-S
        MACSJ0018.5+1626       ACIS-I
        SDSSJ162501.98+4309    ACIS-S
        PerseusclusterE        ACIS-I
        Radiation Belts                     Sep  8
        MACSJ0018.5+1626       ACIS-I
        PSRJ1015-5719          ACIS-I
        VV114                  HRC-I
        Abell2255              ACIS-I       Sep  9
        RMJ232421.7+020618.6   ACIS-I
        PerseusclusterE        ACIS-I
        G29-38                 HRC-I
        PSRJ1015-5719          ACIS-I       Sep 10
        PerseusclusterE        ACIS-I
        Radiation Belts                     Sep 11
        3CR17                  ACIS-S
        PSRJ1015-5719          ACIS-I
        G29-38                 HRC-I
        WISEAJ121024.53+563    ACIS-S
        3CR17                  ACIS-S       Sep 12
        VelaX-1                ACIS-S/HETG
        VV114                  HRC-I
        B2.20505+27            ACIS-S
        GL783                  ACIS-S
        Radiation Belts                     Sep 13
        WISEAJ121024.53+563    ACIS-S
        VV114                  HRC-I        Sep 14

------------------------------------------

All spacecraft subsystems except HRC-S continued to support nominal operations.

Return to Status Reports