Friday 4 September 2026 9.00am EDT
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Sep 2 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). Of note this week, a call for white papers for a new set of Chandra Cool Target (CCTs) was released. These are targets useful to assist in thermal control of Chandra susbsystems when suitable non-CCT targets are not available. The current call will supplement the targets selected from the first call in 2018. White papers are due Oct 23. For details, see https://cxc.cfa.harvard.edu/proposer/CCTs.html The schedule of targets for the next week is shown below. |
------------------------------------------
Radiation Belts Sep 7
SDSSJ162501.98+4309 ACIS-S
MACSJ0018.5+1626 ACIS-I
SDSSJ162501.98+4309 ACIS-S
PerseusclusterE ACIS-I
Radiation Belts Sep 8
MACSJ0018.5+1626 ACIS-I
PSRJ1015-5719 ACIS-I
VV114 HRC-I
Abell2255 ACIS-I Sep 9
RMJ232421.7+020618.6 ACIS-I
PerseusclusterE ACIS-I
G29-38 HRC-I
PSRJ1015-5719 ACIS-I Sep 10
PerseusclusterE ACIS-I
Radiation Belts Sep 11
3CR17 ACIS-S
PSRJ1015-5719 ACIS-I
G29-38 HRC-I
WISEAJ121024.53+563 ACIS-S
3CR17 ACIS-S Sep 12
VelaX-1 ACIS-S/HETG
VV114 HRC-I
B2.20505+27 ACIS-S
GL783 ACIS-S
Radiation Belts Sep 13
WISEAJ121024.53+563 ACIS-S
VV114 HRC-I Sep 14------------------------------------------
All spacecraft subsystems except HRC-S continued to support nominal operations.