Operations CXO Status Report

Friday 21 April 2006 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A realtime procedure was completed on Mar 16 to update the on-board Ephemeris.

The schedule of targets for next week is shown below and includes an observation of M81 coordinated with the VLA.

------------------------------------------
V1118 Ori               ACIS-S       Apr 23
Capella                 HRC-S/LETG
M81*                    ACIS-S/HETG  Apr 24
Radiation Belts
SMC Deep Field 1        ACIS-I       Apr 25
SDSSJ1243-0232          ACIS-S
NGC4701                 ACIS-S
3C327                   ACIS-S
SMC Deep Field 1        ACIS-I       Apr 26
Radiation Belts                      Apr 27
AX J2027.6+4116         ACIS-I
Kepler's Supernova      ACIS-S
Radiation Belts                      Apr 29
NGC 1672                ACIS-S       Apr 30
Q2237+0305              ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.