News by Date
Open and close menu tab
News by Category
Open and close menu tab
Press Resources
Open and close menu tab
Web Shortcuts
Open and close menu tab
Operations CXO Status Report

Friday 12 November 2021 9.00am EST

During the last week Chandra completed the observing schedule as planned.

Chandra passed through the Fourth, fifth and sixth eclipses of the season on Nov 6, Nov 9 and Nov 11 respectively, with nominal power and thermal performance.

The schedule of targets for next week is shown below and includes observations of GRS 1915+105 coordinated with NICER and NuSTAR, and observations of GRB211106A, which was accepted as a Target of Opportunity on Nov 10.



------------------------------------------
        Radiation Belts                     Nov 14
        A1795                  ACIS-S
        RXJ1053.7+5735         ACIS-S       Nov 15
        PSZ2G074.75-24.59      ACIS-I
        LAMOSTJ025414.25+26    ACIS-S
        GRS1915+105            ACIS-S/HETG  Nov 16
        GRB211106A             ACIS-S
        PSZ2G322.63-49.15      ACIS-I
        WISEJ041010.60-0913    ACIS-S
        Radiation Belts                     Nov 17
        GRS1915+105            ACIS-S/HETG
        JWST-DTDF-1            ACIS-I
        NGC777                 ACIS-S       Nov 18
        Mrk279                 HRC-S /LETG
        NGC777                 ACIS-S
        JWST-DTDF-1            ACIS-I       Nov 19
        NGC777                 ACIS-S
        2RXSJ011941.5-12245    ACIS-I
        Radiation Belts                     Nov 20
        A1795                  ACIS-I
        RXJ1053.7+5735         ACIS-S
        SDSSJ095823.14+5000    ACIS-S
        PSZ2G287.96-32.99      ACIS-I
        WISEJ041010.60-0913    ACIS-S       Nov 21
        NGC1534                ACIS-S
        MCG+2-57-2             ACIS-S
        LAMOSTJ025414.25+26    ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports