News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
Web Shortcuts
Chandra Blog
RSS Feed
Image Use Policy
Questions & Answers
Glossary of Terms
Operations CXO Status Report

Friday 16 November 2018 9.00am EST

During the last week Chandra completed the observing schedule as planned.

Real-time procedures were executed on Nov 10 to dump OBC-A and -B memory as a follow-up to the patches uplinked last week. The dumps will be used to update the baseline memory images maintained on the ground.

A Chandra image release was issued on Nov 15 describing the combination of Chandra X-ray observations and LOFAR low-frequency radio observations of the cluster of galaxies Abell 1033. The data show that the cluster is composed of two subclusters in the process of merging, and reveal a variety of highly energetic phenomena, including shock waves in the hot X-ray emitting intracluster gas produced from the high speed of the merging process, and jets emerging from several of the cluster galaxies. The image also shows a "radio phoenix" consisting of a cloud of electrons that faded in radio emission but was then reenergized when shock waves compressed the cloud. For details see: http://chandra.si.edu/photo/2018/a1033/

The schedule of targets for the next week is shown below and includes an observation of ESO 338-IG04, which was accepted as a Director's Discretionary Time Target of Opportunity on Sep 21, and an observation of MAXIJ1820+070, which was accepted as a Target of Opportunity on Nov 14 and is coordinated with the VLA.



------------------------------------------
        Radiation Belts
        ESO338-IG04HLX-1       ACIS-S       Nov 19
        MAXIJ1820+070          ACIS-S/HETG
        SDSSJ172227.18+3207    ACIS-S
        Perseus_west_cf_2      ACIS-I
        PKS0405-123            HRC-S /LETG  Nov 20
        PSRJ0656-2228          ACIS-S
        Abell2219              ACIS-I
        Radiation Belts                     Nov 21
        Perseus_west_cf_2      ACIS-I
        PKS0405-123            HRC-S /LETG  Nov 22
        Abell2219              ACIS-I       Nov 23
        Radiation Belts                     Nov 24
        Abell2219              ACIS-I
        SN2012fh               ACIS-S
        RWAur                  ACIS-S
        LSBCF570-06            ACIS-S       Nov 25
        PSRJ1838+1650          ACIS-S
        A1795                  ACIS-I

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports