Operations CXO Status Report

Friday 27 October 2017 9.00am EDT

During the last week the observing schedule was replanned to incorporate an observation of IGR J16597-3904, which was accepted as a Target of Opportunity on Oct 23, and observations of GALEX J101007.7+0331 and NGC 5297. Loads for the replanned schedule were uplinked on Oct 24. A scheduled observation of Tycho's Supernova Remnant was impacted by the replan and will be rescheduled in a future week.

The schedule of targets for the next week is shown below and includes an observation of XTE J1810-197 coordinated with XTE, an observation of FRB121102 coordinated with GBT, and an observation of AT 2017gbl, which was accepted as a Target of Opportunity on Oct 17.



------------------------------------------
        NGC5377                ACIS-S       Oct 29
        NGC1275                ACIS-S/HETG
        Tycho'sSupernovaRe     ACIS-S/HETG  Oct 30
        Radiation Belts                     Oct 31
        NGC1275                ACIS-S/HETG
        FRB121102              ACIS-I       Nov  1
        NGC4096                ACIS-S
        NGC1275                ACIS-S/HETG
        Tycho'sSupernovaRe     ACIS-S/HETG
        XTEJ1810-197           ACIS-S       Nov  2
        Radiation Belts                     Nov  3
        PSRJ2032+4127          ACIS-S
        AT2017gbl              ACIS-S
        NGC1275                ACIS-S/HETG
        Tycho'sSupernovaRe     ACIS-S/HETG
        NGC4192                ACIS-S       Nov  4
        NGC1275                ACIS-S/HETG
        Tycho'sSupernovaRe     ACIS-S/HETG
        Radiation Belts                     Nov  5
        PSRJ2032+4127          ACIS-S
        Tycho'sSupernovaRe     ACIS-S/HETG  Nov  6

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports